[<<Prev]
[Next>>]
[January 4, 2007]


Today I banged out the last interior rib on the right tank. It feels great to be done all of them. I figured it took about 12 hours to do all 5 ribs. 1.10 oz total of sealant per rib seemed to be the magic number for me to shoot for when mixing proseal.


Finally, I clecoed the left skin to all of the ribs and checked allignment. Then I unclecoed the outboard two ribs so I can get banging away on them. My plan is to bring the left tank up to the state that the right tank is in now before I move on.
[<<Prev]
[Next>>]

http://RVplane.com

Last Modified: May 16, 2024